Burton street Sligo
Start Date 2023
Job Name: Construction of 6no. Apartments including all associated Site works.
Address: Burton Street, Co. Sligo
Description: K&D Developments (Sligo) Limited are excited to announce our latest construction project of a “Turnkey Finish” Apartment Complex Development of 6No. Units in total including all associated site works, consisting of 3No. 1 Bedroom Apartments and 3No. 2 Bedroom Apartments with a combined floor area of 528 square meters at Burton Street, Sligo, Ireland with wheelchair accessible Residential lift from ground to top floor:
Including all site works i.e., Demolition of existing property, installation of surrounding infrastructure, new sewage, surface water drainage system & landscaping etc.
The 3no. 1 Bedroom Apartments will each consist of:
- 8m2 Living / Dining Room.
- 1 no. Bedroom with an area of 14.7m2.
- 6m2 Hallway.
- 8m2 W.C.
- 0m2 Storage Room.
- 3m2 Terrace.
The 3no. 2 Bedroom Apartments will each consist of:
- 9m2 Living / Dining Room.
- 1 no. Bedroom with an area of 15.9m2
- 1no Bedroom with an area of 7.5m2.
- 1m2 Hallway.
- 0m2 W.C.
- 6m2 Storage Room.
- 6m2 Terrace.
Skills: Design & Build, Project Management, EHS Management, Client care.
Trades: : Demolition, A3 BER, Strip foundations, cavity wall construction, Mechanical, Electrical, pumped Platinum bead insulation, Carpentry 1st & 2nd fix, Pre-fabricated Roof truss construction, Roof Insulation, Precast Hollow core slabs, Air-tightness works, Future proof double glazed windows and doors, Aluminium fascia soffit gutters and down pipes, Painting and decorating, Tiled splashback areas.
Client: K&D Developments (Sligo) Limited
Architect: Vincent Hannon Architects (VHA)
Engineer: CST Group Consulting Engineers
Union Walk Business Park,
Ballisodare, Co. Sligo,
F91 HC67
+353 - (071) - 930 4977 (Office)
+353 - (0)86 - 234 2302 (Liam)
+353 - (0)86 - 221 0433 (Clement)